Clean ROOM ISO 8
Clean ROOM ISO 8
EXW ONO plus VAT
€50,000
Year of construction
2020
Condition
Used
(fully functional)
Location
Łódź 

Machine data
- Machine type:
- Clean ROOM ISO 8
- Year of construction:
- 2020
- Condition:
- excellent (used)
- Functionality:
- fully functional
Price & Location
EXW ONO plus VAT
€50,000
- Location:
- Łódź, Poland

Call
Details about the offer
- Listing ID:
- A14477200
- Update:
- 02.01.2024
Description
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
Nlodpfx Abeq H H Rujkjc
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
The listing was translated automatically. Translation errors are possible.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
Nlodpfx Abeq H H Rujkjc
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
The listing was translated automatically. Translation errors are possible.
Seller
Note: Register for free or log in, to access all information.
Registered since: 2023
1 listing online
Send inquiry
Telephone & Fax
+48 728 4... show
These listings may also fit your interest.
Auction
Ends in
d
h
min
s
Auction ended
Rheinland-Pfalz
1,185 km
Drilling and milling center
Format4c-express 920 classic
Format4c-express 920 classic
Listing
Meiningen
1,316 km
Recirculating oven 300°C electric
Ingenieurbüro Klein mit Umluft, NanodacUK 8820-300
Ingenieurbüro Klein mit Umluft, NanodacUK 8820-300
Auction
Ends in
d
h
min
s
Auction ended
Rheinland-Pfalz
1,145 km
Vertical machining center
TakumiV18A
TakumiV18A
Auction
Ends in
d
h
min
s
Auction ended
Hessen
1,199 km
Press brake
BoschertProfi 28 CNC
BoschertProfi 28 CNC
Listing
Ahaus
1,037 km
Pillar Type Swivelling Crane
ABUSLS / 4000 MM x 1000 KG
ABUSLS / 4000 MM x 1000 KG
Auction
Ends in
d
h
min
s
Auction ended
Hessen
1,199 km
Scribing and dot peen marking machine / Engraving machine
Nill + RitzTSM 15-10-UG
Nill + RitzTSM 15-10-UG
Auction
Ends in
d
h
min
s
Auction ended
Hessen
1,199 km
Engraving machine
RichterPGM 500
RichterPGM 500
Listing
Germany
1,293 km
Convection Oven
NaberthermN500/65HA
NaberthermN500/65HA
Auction
Ends in
d
h
min
s
Auction ended
Hessen
1,199 km
Endogas generator
Hammer GmbHLarus Endogas Generator
Hammer GmbHLarus Endogas Generator
Auction
Ends in
d
h
min
s
Auction ended
Baden-Württemberg
1,330 km
Cylindrical grinding machine
KellenbergerKEL-VISION
KellenbergerKEL-VISION
Listing
Hradec Králové
1,685 km
Vegetable shredder
Urschel1700
Urschel1700
Auction
Ends in
d
h
min
s
Auction ended
Baden-Württemberg
1,330 km
Cylindrical grinding machine
KELLENBERGER1000 U
KELLENBERGER1000 U
Auction
Ends in
d
h
min
s
Auction ended
Rheinland-Pfalz
1,195 km
Vertical machining center
HAASVF-7/40
HAASVF-7/40
Listing
Enschede
1,025 km
Tube laser cutting machines
Bodor K2
Bodor K2
Auction
Ends in
d
h
min
s
Auction ended
Rheinland-Pfalz
1,195 km
Travelling column milling machine
ANAYAKHVM 3300
ANAYAKHVM 3300
Your listing has been deleted successfully
An error has occurred





























































































































































